    Steel cofferdam is a temporary enclosure built within, or in pairs across, a body of water and constructed to allow the enclosed area to be pumped out, creating a dry work environment for the major work to proceed. Enclosed coffers are commonly used for construction and repair of oil platforms, bridge piers and other support structures built within or over water. Ordinarily, there are steel sheet pile cofferdams, Lock-type steel sheet pile cofferdams, double wall steel boxed cofferdams, single wall steel boxed cofferdams and steel suspending cofferdams.

  • Steel Sheet Pile Cofferdam

    Steel sheet pile cofferdams are used for retaining water and earthas the enclosure protection, when foundation pitsareexcavating for medium or small cushion caps whose basement depth is from 6 to 8metres.

  • Lock-type Steel Sheet Pile Cofferdam

    Lock-type steel sheet pile cofferdams are used for retaining water and earthas the enclosure protection, when foundation pitsareexcavating for medium or large cushion caps whose basement depth is from 8 to 18metres.

  • Double Wall Steel Boxed Cofferdams

    Double wall steel boxed cofferdamsare the important facility of bridges’ deepwater foundation, ordinarily above the river. In order to meet the demands of manufacture and stress structure, the wall thickness will be 1.2m~2.0m.

  • Single Wall Steel Boxed Cofferdams

    Single wall steel boxed cofferdams apply to maintenance construction whose depth is about 4~10metres.The diameter of cofferdamsare on the small size, and the overburden is relatively thin.

  • Steel Suspending Cofferdam

    Steel suspending cofferdams apply mainly for the basic construction of  elevated pile caps under deep water.And the cofferdams need to add bottom.

  • 1.Engineering Exploration

  • 2.Project Design

    Calculate and design engineering for steel cofferdam.
    Organize the formulation of installation and dismantlement.
    Customize engineering solution for the demands of environmental protection and construction security.
  • 3.Material Leasing and Construction

    Lease the material of steel cofferdam.
    Suction silt and seal the bottom of cofferdam.
    Clean the broken pile head and sludge.
    Provide efficient engineering maintenance and leakage control during service life.