XINGTUBRIDGE>>REFERENCES>CASTING UNLOADING BLOCK

PROJECT CASES

  • Section I of Yuliang Highway North Extension Project

    Cooperative units: Ningbo Branch of CCCC 3rd Navigation Engineering Bureau CO., LTD.

    The section is on the north side of the whole line, with pile number of K0+000~K3+100 and length of 3.1km.

    READ MORE >>
  • Section SG2 of Beijing-Xiong'an Expressway

    Cooperative units: Chongqing Communications Construction (Group) CO., LTD.

    The contract is the section II of Hebei section of Beijing-Xiong'an New District Expressway project. The standard of two-way eight Lane expressway is adopted, with design speed of 120km/h and subgrade width of 42m.

    READ MORE >>
  • Zhenjiang Bridge of Ganzhou-Shaoguan Railway in Shaoguan Guangdong

    Cooperative units: China Construction Sixth Engineering Division Corp, LTD.

    The complete length of Zhenjiang Bridge is 2.3km. It is the longest bridge along Ganshao Railway. The bridge deck adopts the structure of pre-stressed concrete beam, while bridge superstructure adopts steel truss.

    READ MORE >>
<12>