XINGTUBRIDGE>>REFERENCES>PIER PROTECTIVE FRAME

PROJECT CASES

  • Section I of Jiaxing Urban Expressway

    Cooperative units: Hangzhou Wutong Construction Engineering Co.,Ltd.

    Jiaxing Urban Expressway Loop Project is 28.67 kilometers long, which is composed of Zhonghuan West Road, Zhonghuan North Road, Sanhuan East Road and Changshui Road.

    READ MORE >>
  • Section I of Qingyuan Maglev Tourism Special Line Project

    Cooperative units: China Railway 11th Group First Engineering CO., LTD.

    CK19+580~CK27+680 is the starting distance from Yinzhan Station to Chimelong Theme Park of Qingyuan Maglev Tourism Special Line, with the total length of the main line is 8.1km.

    READ MORE >>
  • Section IV of Ningbo-Zhoushan Port Main Channel Highway

    Cooperative units: CCCC 2nd Aviation Bureau No.4 CO., LTD.

    The main line of DSSG04 Section of main passage project of zhoushan port of ningbo is 8.685km long, starting from the north transition pier of south navigation hole and ending at daishan landing point.Among them, the north navigable tunnel bridge adopts continuous rigid frame with steel-concrete mixed beam, and the span layout is 125+260+125m.

    READ MORE >>