XINGTUBRIDGE>>REFERENCES>SECURITY GUARD RAILING

PROJECT CASES

  • Section II of Civil Engineering of Jiaxing Urban Expressway Ring Road Project (Phase I)

    Cooperative units: China Railway 12th Bureau Group CO., LTD.

    The total length of Jiaxing Urban Expressway Loop project is 28.67 km, which is composed of "Central West Road - Central Ring North Road - Third Ring East Road - Changshui Road".

    READ MORE >>
  • Wuxue Yangtze River Bridge

    Cooperative units: Hubei Road & Bridge CO., LTD.

    Wuxue Yangtze River Highway Bridge starts from Siwang, Wuxue, Huanggang, stops at Yangxin, Huangshi, connects the hubei section of Hangzhou Ruili National Expressway, with a total length of 31.001 kilometers, of which the Yangtze river bridge is 3355 meters long, and the connection between the two sides is 27.646 kilometers long.

    READ MORE >>
  • Section 01 of South Extension Viaduct Project of East Complex Line of NO.3 Provincial Road in Zhejiang

    Cooperative units: The 2nd Engineering CO., LTD. of CTCE Group

    The starting point of the project is located in 400 metres north of the intersection of Jianshesi Road in the reconstruction project of the extension section of Xiaoshan East Comlpex Line of NO.03 Provincial Road (Xinjie to Hongken), which is connected with the existing viaduct.

    READ MORE >>
<123>