XINGTUBRIDGE>>REFERENCES>TEMPORARY STEEL BRIDGE

PROJECT CASES

  • Longsha to Dailing Section in Cangnan of NO.228 National Highway

    Cooperative units: NO.5 Engineering CO., LTD. of CCCC 4th Harbor Engineering CO., LTD.

    The main line of the project starts from Shitang village, intersects with Zaolong Line, connects with Longgang to Longsha Section of NO.228 National Highway under construction, passes through Chixi Town and Mazhan Town in the south, ends at Zhejiang Fujian border of Dailing Township.

    READ MORE >>
  • Yuecheng to Huanghua Section of NO.228 National Highway PPP Project

    Cooperative units: NO.5 Engineering CO., LTD. of CCCC 4th Harbor Engineering CO., LTD.

    The starting point of the main line of the project is located in the east of Yueqing City, at the intersection of the Shugang Road under construction in Yueqing Bay Port Area and the planned Qingdong Road.

    READ MORE >>
  • Section CSH-TJ05 of Quick Reconstruction Engineering of Chunshenhu Road

    Cooperative units: Xiangcheng Branch of No.1 Engineering Corporation Limited of CR20G

    The quick reconstruction engineering of Chunshenhu Road starts from Huangqiao in the west, passes through Xiangcheng District along the existing Chunshenhu Road, and passes through Yangcheng West Lake in the form of tunnel and connects with the phase I of Central North Line.

    READ MORE >>