XINGTUBRIDGE>>REFERENCES> Section SG9-8 of Phase I of Civil Construction of Hangzhou Rail Transit Line 9 Project

Section SG9-8 of Phase I of Civil Construction of Hangzhou Rail Transit Line 9 Project

TIME:2020-11-23  SOURCE:Xingtu Bridge

The first phase of Hangzhou Metro Line 9 starts from Sijiqing Station in Jianggan District and ends at Long'anhu Station in Yuhang District, with brown signs. The total length of the line is 29.45 km, including 6.14 km of elevated line and 23.31 km of underground line. There are 21 stations, including 3 elevated stations and 18 underground stations.

RETURN
Close