XINGTUBRIDGE>>REFERENCES> Reconstruction Project of Huaiyang-Xiangcheng Section of No.106 National Highway

Reconstruction Project of Huaiyang-Xiangcheng Section of No.106 National Highway

TIME:2021-04-29  SOURCE:Xingtu Bridge
The starting point of the project is at the level crossing of Liulounan and No.106 National Highway in Huaiyang county (stake No.K814+230), crossing G329 (original S102) at Hanying after crossing Shayinghe River at Caoxianlou, crossing Nanjing-Luoyang Expressway at Zhangying East, passing Wafangzhuang and Lilou, spanning Luohe-Fuyang Railway at southeast of Lidian, then crossing X020 (planned S102) at south of Lidian, and turning south at Heying, passing Xuanliu and Zhouzhuang, after crossing the Yunlianghe River in the west of Malou, crosses the connecting line of Daqing-Guangzhou Expressway, turns southeast after passing the west of Nandun Town, crosses the Qingshuihe River in Tianyuan, turns East after arriving at Shuiniuliu, and arrives at the intersection of Lizhuang and No.106 National Highway (k830 + 055). The total length of the route is 15.825 km.
RETURN
Close