XINGTUBRIDGE>>REFERENCES> No.3 Work Area of Section IV of Huzhou-Hangzhou High-speed Railway

No.3 Work Area of Section IV of Huzhou-Hangzhou High-speed Railway

TIME:2021-04-29  SOURCE:Xingtu Bridge
Huzhou-Hangzhou Railway leads from Huzhou station and connects with Tonglu station of Hangzhou-Huangshan High Speed Railway. It is a double track high-speed railway with a design speed of 350km/h, a main line length of 128.992 km and a tie line of 6.796 km.
RETURN
Close